TOPIC : ____4  PLANNING IV Scope Estimates

  1. OBJECTIVES:
    1. Homework review:

q Program Matrix for house

q Space Performance Data Sheet for house

q Space relationship diagram Recreation Center

q Revise Mission and Guiding Principles for Project Book

q PMI Project Management Context

    1. Tailor Program Matrix form for specific projects and be able to perform an interview to obtain data to complete the Program Matrix form.
    2. Be able to convert net square foot facility requirements into gross square foot scope.
    3. Be able to use Means Costworks to create approximate estimates for various facilities.
    4. Adjust cost estimates for site location and inflation.
    5. Perform cost comparison analysis to determine the most cost effective facility construction/renovation options.

  1. REFERENCES:
    1. Facilities Operations Engineering Reference. R.S. Means,1999.
    2. Engineering Economics and Practice S.A. Rosenthal,1964.
    3. Architectural Programming and Predesign Manager. R.G. Hershberger,1999.
  2. TEXTS:
    1. How to Estimate with Means Data & Costworks, S.A. Murbarak, 1999.
  3. WEB SITES:
    1. .
  4. SUPPLEMENTS:
    1. Facility Program Matrix revised. S 4.1
    2. Health Center Program data S 4.2
    3. Space Performance Data Sheet revised S 4.3
    4. Health Center Exam Room data S 4.4
    5. Facility cost estimates S 4.5
    6. Cost option estimates S 4.6
    7. Email addresses for class S 4.7
  5. PREASSIGNMENTS: None

 

  1. HOMEWORK:  Due Jan 29 at 10am.  Put your name on each sheet.

ALSO BRING A COPY OF YOUR HW TO CLASS.

 

    1. Using supplement S 4.1 create a Program Matrix for the Health Center as described in class and further detailed in S 4.2.  Put it in project book format.
    2. Utilizing supplement S 4.3 make a Space Performance Data Sheet for the Medical Examining room in the Health Center as described in supplement S 4.4.  Put it in project book format.
    3. Compute the facility cost estimates from supplement S 4.5.
    4. Compute the facility cost options from supplement S 4.6.
    5. Make a table of contents for your project book including all project assignments to date.